Tuesday, 28 February 2023

Could I have planned the layout better?

The new "Man Cave" is an extended Dunster log cabin and in part of its construction there are two walls that protrude into the internal space of the room.

Initially I was thinking about turning Rospeath Lane into a "roundy roundy" but these two walls hindered this to some degree. Many plans were drawn but I began to realise that it would become a very ambitious layout. One that may require more time than I have left to bring to a reasonable state of completion. Also I started to have thoughts about how I was going to continue with exhibiting a layout along with improving and learning more about the hobby. That the main reason why Boscarne Junction has been born.

So could I have designed it any better?


I've tried a few different ways of fitting the plan into the space but didn't want to compromise too much on the track plan. My main though was to keep the integrity of the track layout with the only compromise being taken on the siding length. The result being the track plan below.



After posting my thoughts and ideas on a couple of forums I received a good few replies with excellent suggestions. The major problem I had with the track plan above was transferring cassettes between Bodmin North/Wenford and the Bodmin General cassette boards. One suggestion was to curve the Bodmin North line so that the Bodmin North/Wenford and Bodmin General cassette boards could be combined.


I was not sure about curving the Bodmin North line as I felt it would deviate too much from the original and therefore loose some of the genuine feel of the junction. Even so, I played around a little and finished up with the plan below.



I must admit it solves the problem very well with transferring full and empty clay wagons between the Bodmin North/Wenford and Bodmin General Lines. The other bonuses this plan gives are; 
  • It will allow me to include the Southern Railway bridge over the River Camel. 
  • With enough trees this compromise of curving the Bodmin North line could be masked quite well.
  • The trees will also be a natural break between the bridge and junction to give a tantalising glimpse of trains running over the bridge to/from Boscarne to Bodmin North/Wenford before they appear at the junction or disappear into the cassette board.
  • By extending the Bodmin North line will allow any shunting of Siding 2 from this end to be contained within the scenic section of the layout.

As this curve brings the two lines closer together I need to work out the land contours leading up to the Southern Railway Bridge. Also the new baseboard is going to complicate storage and transportation. 


One of the many decisions I need to make is whether to include a track around the back of the layout.  This would be used to exchange clay wagons between the Wadebridge and Bodmin cassette boards rather than carry a cassette the length of the layout. I need to discover how regular clay traffic travelled via Wadebridge and along the North Cornwall Line. Then decide if this is a movement I'd include in the timetable.

Monday, 16 January 2023

My version of Boscarne Junction

Blimey it was way back in 2008 when I was first contemplating building a layout of Boscarne Junction. That one was going to be a fictional take on the junction using some what might have beens. Why fictional? Well it was going to be my first foray into P4 and I wasn't confident about building a model of a real location to an acceptable standard. Tredethy Wharf has given me some confidence that I could achieve a reasonable model of Boscarne and if I don't give it a go I'll never know.

So after much thought and a few plans drawn I think the plan below is the best I can do to represent Boscarne Junction in my new 'Man Cave'.

I've used an old OS map of the junction for scale. A few compromises have been made so it fits in the room and be functional. These are:

  1. Shortened Siding 1 (the exchange siding) by approximately a scale 152 feet
  2. The curve of the line to Bodmin General has been increased
  3. The river and therefore the bridge over the river on the line to Bodmin General has been moved closer to the junction.
There are a few quirks with the track plan that I only noticed when looking through photographs of the junction.
  1. There is a very slight curved running through the first turnout just after the level crossing.
  2. The first turnout from Bodmin General is curved towards the GWR line but straight towards Siding 1.
  3. It looks like the catch point at the Bodmin end of Siding 1 is part of the turnout. I'll try and post a photo to confirm this in a follow up blog.
There are a few niceties that I need to think about:
  • How to transfer clay wagons between the hidden sidings a little more securely than on Tredethy Wharf.
  • Will it be DC or DCC or even have the ability to to run both.
  • How to build very lightweight baseboards so that in 10 years time, when I'm a little frailer, I'll still be able to exhibit the layout.
  • What support structure should I build for the layout? The supports for Tredethy Wharf are now more stable but they take a lot of time to erect and dismantle.
  • Should there two control panels, one for Boscarne Signal Box the second for the Ground Frame, or just one control panel.
  • Where and how to install the Control panels.
  • The cassettes on Tredethy Wharf need improving so need to look for better designs.
More thoughts and problems to solve will no doubt come to light as this project progresses.

It's a shame that I couldn't include the SR bridge over the river Camel but even so I'm hoping the layout still captures the feel of the junction. 

Monday, 9 January 2023

This blog might be about to get a new lease of life

Though Tredethy Wharf has been a good introduction to Scalefour modelling it has not been a layout that I’ve been tempted to operate at home. When set up at home it’s normally just there as a static diorama collecting dust. That said I have enjoyed taking it to shows along with helping out on other layouts at shows. I’ve become to realise making an exhibition of myself in front of a layout is a rewarding experience. Meeting up with friends who help, the meeting of fellow modellers along with the public who ask questions, or just seeing peoples/children’s facial expressions makes the whole event worthwhile.

I feel all that remains for me to do with Tredethy Wharf, apart from a little bit more titivation, is to build more stock for different era’s. These might be late 1960s Blue class 08s with clay hoods, even possibly consider 1930s stock. I’ve had many complementary comments along with much encouragement to keep Tredethy Wharf available for exhibitions. But I know I have much more to learn, more skills to conquer along with some mental barriers to cross

Rospeath Lane was been design to give me these challenges but it is a layout that has not really been designed as an exhibition layout. With two main baseboards being 4’6”x3’ it will be difficult to handle and transport by myself. By the time it’s in a state to exhibit I’ll probably be to infirm to manage it. Even though progress has stagnated during the last 18 months I’m still very committed to continuing with Rospeath Lane but only as a home based layout.

So what can I build to continue and expanding by exhibiting experience?

Back in April 2020 I posted a blog titled ‘Deciding on the next project’At that time all five were designed to fit in the ‘Man Cave’ at the previous house. In revisiting these ideas one stands out more than the others as a possible exhibition layout. Then to add further incentive to this idea I had the opportunity to purchase, from the late Jon Lord’s collection of rolling stock, an Adams O2 converted to P4. A very nice model indeed.

I took this as a sign that the project to look at in more detail as a successor to Tredethy Wharf is Boscarne Junction. It will follow on nicely from Tredethy Wharf, keeping in the family so to speak. All the rolling stock I have build and likely to build for Tredethy Wharf will potentially be used on Boscarne Junction. More importantly it will give me many new challenges to overcome especially represent a real location.

Planning and ideas are continuing to develop so more posts will follow shortly.

Sunday, 3 June 2012

Photos of Bridges at Boscarne Junction (part 2)

These are further photos I took in 2012 of the bridges at Boscarne Junction. This are of the Southern Railway bridge over the river Camel.

Looking from the direction of the GWR bridge

Closer view from same direction as above photo


View along footpath bridge from Dumere end

Looking across at railway bridge from footpath bridge

Looking towards Dunmere from footpath bridge

Looking down from Railway bridge up stream
 
Looking towards Boscarne along trackbed

Looking towards Dunmere along trackbed showing footpath

Looking towards Dunmere along trackbed

Wednesday, 30 May 2012

Photos of Bridges at Boscarne Junction (part 1)

Boscarne Junction is now probably not a first choice for a future model. However, when I was in Cornwall it was still a serious option that was on the table. The two bridges over the river Camel at Boscarne would be an important part of any layout of this junction (fictitious or accurate) and to record these was one objective while I was there. So for anyone that might be interested, a few photos follow showing the bridge that carries the old GWR line to Bodmin General over the river Camel:


Photo looking back up the line to Bodmin General from Boscarne Junction

Looking down stream on the south bank.

Looking across stream from the previous photo



Looking back up stream on the south bank.

As a guide for scale, my trusty stead is 10.5 hands tall to top of saddle (107cms or 42 inches in old money). I'll publish photos of the bridge on the SR line to Bodmin North in a future post.

Monday, 4 October 2010

Wenford DVD

I recently purchased a DVD produced by Branch Line Video titled 'Memories of the Bodmin & Wadebridge Railway'. I had mulled over the purchase for a while but as the front cover had a picture of a Beattie Well Tank at Dumere Crossing I thought it might contain something of interest on the Wenford Bridge line. Being not sure what to expect I was, after viewing, extremely please with the purchase. I would highly recommend this DVD to anyone interested in this area and the workings of the Wenford Bridge line.

It comes with two DVDs, the first covers the history of the line starting with brief footage of the North Cornwall Line then moving onto the main subject highlighted with many stills and brief cine film. Of more interest to me is the second DVD. It has cine film footage of two trips down the Wenford Bridge branch. One starting with footage of workings at Wadebridge and progressing to an empty clay train working hauled by a Beattie 30585. The second of a Brake Van special hauled by 1369. Both have anecdotal commentary from men who worked the line. Footage is not surprisingly showing its age but still fantastic to see.

Sunday, 2 August 2009

Thoughts while decorating

While decorating, my mind is tending to wander a little......

I keep getting thoughts about the amount of stock I have planned to build for Boscarne. The realisation that I have to plan my next purchase due to the extended lead times of some manufacturers means I have to place my next order soon. Also the need to know what I need so I can purchase other items when I come across them (as they might not be in production for long). These thoughts are causing me to ask myself continuous questions. This flipping decorating malarkey is also putting me well behind schedule! How can I get myself back on track?

My original idea was/is to base both layouts in 1961/62. During this period there were many changes to the locos shedded at Wadebridge and seen on this branch. These changes give opportunities for the following locos to be used: 1 x Beattie Well Tank, 1 x 13xx, 1 x N Class 2-6-0s, 1 x O2, 1 or 2 x 45xxs, 1 or 2 x 57xx, 1 or 2 Class 22 Hydraulics, plus an 1 Ivatt 2-6-2T 2MT. This is 8 - 11 locos to convert or build and detail. This is without listing all the coaching and freight stock required.

Hmmmm .... Irrespective of the fact that all the above will also be seen running though Grogley Junction, I'm thinking this may be a little too much to be my first objective for a reasonable timetable to be represented. Granted I would not require it all straight away but Boscarne Wharf Junction layout is only suppose to be, a test P4 layout, a layout on a plank, something I can put together in a reasonably short period of time!!!! Trouble is it is starting to grow arms and legs and becoming more than I originally planned. This might not be a bad idea as ultimately, if it turns out OK, it could be an extension to Grogley Junction. Question is, just for now, do I need to cut down my thoughts for Boscarne's initial stock list? Doing so may enable me reach a state of completion that will allow me to progress onto the main project, Grogley Junction, sooner rather than later. Think I need to put some blinkers on ......

My thoughts over the last few days are turning to considering the 1970s as a possible era for Boscarne. The line was freight only by then. I think passenger services ceased in 1967 but Wadebridge was kept open for freight via Bodmin General until 1974. I would only require two locos and a few freight wagons plus clay wagons with or without hoods depending on year. One Class 08 and, depending on when in the 1970s, one of the following, a Class 22 or Class 25 or Class 37. The thought of hearing a Class 25 stood idling in amongst the trees on a hot summers day (it's a shame we can't depict a misty/rainy Cornish day with dripping trees) while waiting for the 08 to bring full clay wagons down from Wenford is attractive.

Operationally this will be limited but would enable me to reach a point where I could say 'finished for now'. I could then move on to the main project, Grogley Junction. Two problems are: I would struggle to justify running these locos through Grogley as its track would probably have been rationalised in the 1970s and I think all wharf sidings on the line were closed or lifted by 1969.

I'll keep stripping and painting ........ and thinking.