Can anyone clarify what a Wharfingers tasks/responsibilities were?
Sunday, 26 April 2009
Wharfingers responsibilites
Saturday, 25 April 2009
Boscarne Junction + Wenford Junction
Just toying with an idea to extend the Bodmin North line to include the junction for Wenford Bridge. This would possibly change the viewing side to the top, looking down into the valley at Boscarne, rather than up out of the valley if I leave the plan as it is in my "Boscarne Junction + Wharf (3)" posting.
Sunday, 29 March 2009
Further thoughts
While driving to work this morning I was reflecting on what I was doing the previous evening. Watching the Barcelona v Chelsea game, more sleepers where being cut and stained. I also opened the P4 point kit and read though the instructions. This brought me to thinking about my lack of progress with Boscarne. To create another short piece of test track and/or build the point kit is fine but I don't feel I'm making any progress. Building baseboards is where my head is really at at the moment and putting this off until I have more information on the Boscarne site is frustrating me. So why have I not put the wood to the saw? It's because I have this demon that says it has to be right. Boscarne is a real location so my layout should reflect this, including the correct height of rail above the river bed. Without this information I don't know the height of the baseboard edges. Hmmm.... is this so important?
Wednesday, 25 March 2009
Boscarne Junction + Wenford Junction
Just toying with an idea to extend the Bodmin North line to include the junction for Wenford Bridge. This would possibly change the viewing side to the top, looking down into the valley at Boscarne, rather than up out of the valley if I leave the plan as it is in my "Boscarne Junction + Wharf (3)" posting.
Wednesday, 25 February 2009
Boscarne Junction + Wharf (3)
Well this is it, the test track! A little bit more that the plank with a little track and a couple of points but should be interesting to build. It should also throw up some good questions along the way.


Sunday, 1 February 2009
1st February already
Well were has January gone? One month on and not a lot has happened with the project. I've been spending most of my spare time consolidating my wargaming projects and finishing off units that have been on the bench for far too long. Still have a few to paint but, while painting, I have been mulling over baseboard sizes for the Boscarne Wharf layout. As I could be moving house in the next couple of years I have to plan this layout to be portable. Nether do I think I will be changing the car for a while so it will need to fit into the back of a Peugeot 306. Not a lot of space. Looking at track plan and available space in car, 3.5 foot is the maximum board length. 3.5 foot legths also fits the track plan well making the scenic length 10.5 feet long and adding a further 14 inches to the Grogley end increasing the temptation to add a halt. I've not finalised width but I'm considering that junction end be "Y" shaped following the shape of the track plan. Thus giving baseboard ends that are 90 degrees to the track and not cutting across at an angle. This would make this end approximately 2.5 feet wide depending on scenics. This would also create two narrow fiddle yards splaying out at an angle to each other. (Would this create a problem in operation?). The other boards could be as narrow as 18 inches. I may be able to get away with three square baseboards 3.5 ft x 2 ft but keeping the boards narrow will mean less scenic work. Also by introducing an irregular shaped baseboard will test my fledgling carpentry skills. I do need to keep in mind that this is supposed to be a test layout. It is better to fail and learn than not learn at all.